|
Construction & Design Standards Table of Contents |
|
|---|---|
| Table of Contents | CONSTRUCTION & DESIGN STANDARDS TABLE OF CONTENTS |
| Section 1 |
GENERAL INFORMATION - 1.0 INTRODUCTION - 1.1 DESIGN STANDARDS - 1.2 MAPPING STANDARDS |
| Section 2 | INSTALLATION OF WATER FACILITIES |
| Section 3 | Staking Requirements-Examples of Lettering, Developer Responsibilities. UNDER REVIEW-PLEASE CONTACT Tiffany Bowling at 834-8044 or Kelly McGlynn at 834-8293 for further information. |
| Section 4 | EXCAVATION AND TRENCHING SAFETY REQUIREMENTS |
| Section 5 | TRENCH BEDDING & BACKFILL |
| Section 6 | Trench Excavation Standards-Trenching Guidelines, Safety, Box/Vault/Junction Enclosure Installation. UNDER REVIEW - Please contact Tiffany Bowling at 834-8044 or Kelly McGlynn at 834-8293 for further information. |
| Section 7 | Typical Trench Details Mains, Cathodic Protection, Hydrant Bypass, Refurbishment and General Utility Locations. UNDER REVIEW - Please contact Tiffany Bowling at 834-8044 or Kelly McGlynn at 834-8293 for further information. |
| Section 8 and 8a | Water and Sewer Separation-Mains and Services. Potable and Non Potable Water Separation. UNDER REVIEW - Please contact Tiffany Bowling at 834-8044 or Kelly McGlynn at 834-8293 for further information. |
| Section 9 | Water Construction Standards- Types of Pipes, Meters and Provisions, Fittings, Taps, Cathodic Protection. UNDER REVIEW - Please contact Tiffany Bowling at 834-8044 or Kelly McGlynn at 834-8293 for further information. |
| Index to Appendix 10 | APPENDIX 10A THROUGH APPENDIX 10M |
| Appendix 10A | BACKFLOW PREVENTION ASSEMBLIES |
| Appendix 10B | Distribution Branch Installations |
| Appendix 10C | Distribution Transition Fittings- 6" Transite Pipe to 6" PVC/DI Pipe through 12" Transite to 12" PVC/DI Pipe. UNDER REVIEW-PLEASE CONTACT Tiffany Bowling at 834-8044 or Kelly McGlynn at 834-8293 for further information. |
| Appendix 10D | Distribution Tap Assemblies - 4" through 12" taps |
| Appendix 10E | Flush assembly Installations- 6" through 12". UNDER REVIEW-PLEASE CONTACT Tiffany Bowling at 834-8044 or Kelly McGlynn at 834-8293 for further information. |
| Appendix 10F | Fire Protection Installations - 4" through 12" |
| Appendix 10G | Horizontal Elbow Installations- 6" 11.25 degree through 12" 90 degrees. UNDER REVIEW-PLEASE CONTACT Tiffany Bowling at 834-8044 or Kelly McGlynn at 834-8293 for further information. |
| Appendix 10H | Service Tap Installations - 1" through 2" service taps |
| Appendix 10I | Vertical Elbow Installations - 4" through 12" Elbows. |
| Appendix 10J | Distribution Valves |
| Appendix 10K | Small Water Meters - 3/4" through 2" meters |
| Appendix 10L | Miscellaneous Water Details - NOTE THAT ONLY DETAILS 10L-01, 10L-02 AND 10L-05 ARE CURRENT IN THIS SECTION. CONTACT TIFFANY BOWLING AT 834-8044 IF YOU REQUIRE OTHER DETAILS LISTED IN THE INDEX, 10L-01. |
| Appendix 10M | Large Water Meters - 4" and larger - Under development |
| Safety Handbook | SAFETY HANDBOOK FOR TMWA - UNDER REVIEW |