Truckee Meadows Water Authority's most recent bids are listed below. Bidders should check the website daily to view any addenda that may be issued throughout the bidding process. It is each bidder's responsiblity to ensure that they have received all addenda prior to submission of their bid.
TMWA is required to comply with Nevada Revised Statutes which are incorporated into our bidding procedures. Projects that have Homeland Security risks require a Security Deposit to ensure that the plans and specifications are returned to TMWA. For more information, use the links on the right side of this page.
TMWA Janitorial Bid (re-bid) / Contract No. 0809-061
- Advertisement 7/23/08
- Bid Document 7/21/08
- Pre-Bid Attendees 8/7/08
- Bid Tabulation Report 8/19/08
- Contract Award
2008/2009 Flume Rehab - Lumber Purchase / Contract No. 0809-051
- Advertisement 7/16/08
- Bid Document 7/14/08
- Addendum #1 7/14/08
- Bid Tabulation Report 7/23/08
- Contract Award 7/24/08
Feasibility Evaluation of Possible Consolidation of Water Utilities in Southern Washoe County, Nevada / RFQ No. 0809-047
- Advertisement 7/16/08
- RFQ Document 7/11/08
- Contract Award unknown
Fleish Flume Replacement Project , Phase 2 / Contract No. 0809-007
- Advertisement 6/18/08
- Pre-Bid Attendees 6/25/08
- Plan Holders List 7/9/08
- Addendum #1 7/1/08
- Addendum #2 7/8/08
- Bid Tabulation Report 7/10/08 posted
- Contract Award 7/24/08
Glendale Pump Upgrade Project, Phase 2 / Contract No. 0809-006
- Advertisement 6/17/08
- Pre-Bid Attendees 7/2/08
- Plan Holders List 7/9/08
- Addendum #1 7/1/08
- Addendum #2 7/7/08
- Addendum #3 7/16/08
- Bid Tabulation Report 7/23/08
- Contract Award
Carbon Dioxide / Contract No. 0809-008
- Advertisement 6/18/08
- Bid Document 6/13/08
- Bid Tabulation Report 7/2/08
- All Bids Rejected - see Bid Tabulation Report
TMWA Main Relocations - RTC Street and COR Sewer Rehabilitations / Contract No. 0809-005
- Advertisement 6/12/08
- Pre-Bid Attendees 6/19/08
- Plan Holders List 6/27/08 (Final)
- Addendum #1 6/25/08
- Bid Tabulation Report 6/26/08
- Contract Award 7/10/08
Sodium Hypochlorite / Contract No. 0809-001
- Advertisement 6/4/08
- Bid Document 6/2/08
- Bid Tabulation Report 6/19/08
- Contract Award 7/1/08
Dense Soda Ash (Sodium Carbonate) / Contract No. 0809-002
- Advertisement 6/4/08
- Bid Document 6/2/08
- Bid Tabulation Report 6/19/08
- Contract Award 7/1/08
TMWA Janitorial Contract / Contract No. 0708-031
- Advertisement 5/20/08
- Bid Document 5/15/08
- Pre-Bid Attendees 5/29/08
- Addendum #1 6/3/08
- Bid Tabulation Report 7/18/08
- All Bids Rejected - see bid tabulation
Sparks Groundwater Treatment Plant Landscaping - Phase 2 / Contract No. 0708-268 (Project Canceled)
- Advertisement 4/8/08
- Pre-Bid Attendees 4/15/08
- Addendum #1 4/16/08
- Bid Tabulation Report 4/21/08
TMWA North Virginia 12-inch Water Main - College Drive to Sierra Street / Contract No. 0708-257
- Advertisement 3/20/08
- Pre-Bid Attendees 3/31/08 posted
- Plan Holders List 4/4/08
- Addendum #1 4/2/08
- Bid Tabulation Report 4/15/08 posted
- Contract Award 5/2/08
2008 Pump Station Rehabilitation / Contract No. 0708-248
- Advertisement 3/14/08
- Pre-Bid Attendees 3/27/08 posted
- Plan Holders List 4/4/08
- Addendum #1 3/27/08
- Addendum #2 4/4/08
- Addendum #3 4/7/08
- Addendum #4 4/9/08
- Bid Tabulation Report 4/10/08 posted
- Contract Award 4/21/08
Liquid Polyaluminum Chloride / Contract No. 0708-249
- Advertisement 3/14/08
- Advertisement 4/2/08
- Complete pre-qualification document 3/31/08
- List of approved Manufacturers not available yet
TMWA Main Relocation - Reno Sewer Rehab at Lakeside Drive Manzanita Lane & Plumas Street / Contract No. 0708-226 - Project Canceled
- Advertisement 2/13/08
- Pre-Bid Attendees 2/21/08
- Addendum #1 3/3/08 Project Canceled
- Plan Holders List 2/19/08
Stead AFB Main / Meter Replacement - Phase 1 Sierra View / Contract No. 0708-201
- Advertisement 2/4/08
- Pre-Bid Attendees 2/21/08
- Plan Holders List 3/10/08
- Addendum #1 2/29/08
- Addendum #2 3/7/08
- Bid Tabulation Report 3/13/08 posted
- Contract Award 3/31/08
Glendale Pump Upgrade Project, Phase 2 - Purchase of 4160 Volt Metering and Distribution Switchgear/ Contract No. 0708-207
- Advertisement 2/4/08
- Bid Document exempt from homeland security
- Technical Specifications & Drawings 2/5/08
- Addendum #1 2/27/08
- Addendum #2 3/7/08 note revised bid date
- Bid Tabulation Report 3/20/08 posted
- Contract Award 3/28/08 Utility Metering Switchgear
- Contract Award 3/28/08 HEPS Distribution Switchgear
Glendale Pump Upgrade Project, Phase 2 - Purchase of Sparks Zone AFD's / Contract No. 0708-206
- Advertisement 1/28/08
- Bid Document exempt from homeland security
- Technical Specifications & Drawings 1/28/08
- Addendum #1 2/5/08
- Addendum #2 2/19/08
- Bid Tabulation Report 2/26/08 posted
- Contract Award 3/5/08
Glendale Pump Upgrade Project, Phase 2 - Purchase of Sparks Zone Pumps / Contract No. 0708-205
- Advertisement 1/9/08
- Bid Document exempt from homeland security
- Technical Specifications & Drawings 1/9/08
- Addendum #1 1/30/08
- Bid Tabulation Report revised for recommended award 2/22/08
- Contract Award 2/25/08
Fleish Transformer Replacement Project - Equipment Purchase / Contract No. 0708-152
- Advertisement 11/26/07
- Bid Document 11/21/07 exempt from Homeland Security
- Bid Tabulation Report 12/18/07
- Contract Award 12/21/07
Pyramid Water Tank Phase I - Site Work / Contract No. 0708-165
- Advertisement 11/23/07
- Pre-Bid Attendees 12/11/07 at 2:00 p.m.
- Plan Holders List 12/17/07
- Addendum #1 12/6/07
- Addendum #2 12/12/07
- Addendum #3 12/14/07
- Geotechnical Investigation Report -Introduction
- Geotechnical Investigation Report -Appendix A
- Geotechnical Investigation Report -Appendix B
- Geotechnical Investigation Report -Appendix C
- Geotechnical Investigation Report -Appendix D
- Bid Tabulation Report 12/18/07
- Contract Award 1/2/08
Pyramid Water Tank Phase II - Tank Improvements / Contract No. 0708-166
- Advertisement 11/23/07
- No Pre-Bid
- Plan Holders List 12/17/07
- Addendum #1 12/6/07
- Addendum #2 12/12/07
- Geotechnical Investigation Report -Introduction
- Geotechnical Investigation Report -Appendix A
- Geotechnical Investigation Report -Appendix B
- Geotechnical Investigation Report -Appendix C
- Geotechnical Investigation Report -Appendix D
- Bid Tabulation Report 12/20/07 amdended
- Contract Award 12/28/07
Highland Canal Lining Project 2007-2008 / Contract No. 0708-167
- Advertisement 11/26/07
- Pre-Bid Attendees 12/12/07
- Plan Holders List 12/17/07
- Addendum #1 12/14/07
- Bid Tabulation Report 12/19/07
- Contract Award 1/2/08
2007-2008 Curb Valve Retrofit Project / Contract No. 0708-153
- Advertisement 11/21/07
- Bid Document 11/14/07 exempt from Homeland Security
- Proposal Summary Only 11/14/07 exempt from Homeland Security
- Prevailing Wages Only 11/15/07
- Pre-Bid Attendees 12/5/07
- Addendum #1 12/5/07
- Addendum #2 12/10/07
- Bid Tabulation Report 12/13/07
- Contract Award Sparks & N. Reno - Gradex Construction 12/31/07
- Contract Award S. Reno - Paragon Associates 1/2/08
Washoe Hydro Canal Bank Stabilization Project - 2007 (Re-Bid) / Contract No. 0708-147
- Advertisement 11/8/07
- Pre-Bid Attendees 11/20/07 at 2:30 p.m.
- Plan Holders List 11/21/07
- Addendum #1 11/21/07
- Bid Tabulation Report 11/27/07
- Contract Award 12/12/07
50,000 GVW Dump Truck Purchase / Contract No. 0708-114
- Advertisement 10/12/07
- Bid Document exempt from Homeland Security
- Bid Tabulation Report 10/30/07
- Contract Award 11/1/07